lundi 5 juillet 2010

A new "exterior room"...or a loooong hot weekend...

So we finally chose what kind of patio we wanted, what stone to buy, what design, what size and where to put it...

Here are various steps of the hard work we did over 5 days (reversed); we're very happy with the results. Final result to be shown soon.

Final tampering by the great Christian haha

The best helpers/foremen/dads in the world! :)


Almost done (Sunday)! (and yes, I'm paying for that exposed lower back!)

The other side of the patio... we've got amazing helpers, including dad and my brother :)


The first steps on Saturday...a lot of trouble to do those 2 colors, with various designs... but it looks pretty good for beginners! ;)


The stone is in!



The big hole dug by a pro... couldn't imagine how we would manage to do that ourselves (wise choice!). That was June 30. Took the kid the whole day to dig 18 inches deep and prepare the ground.





























samedi 22 août 2009

WARNING / AVERTISSEMENT

For those new on this blog, you may want to start by the bottom of the page, otherwise you'll see the end result before the foundations ;)

Pour les nouveaux sur ce blog, vous préférerez peut-être commencer par le bas de la page, sinon vous verrez le produit fini avant les fondations! ;)

3rd part / partie 3

Finished first floor, with walnut-stained birch.
Prmier étage, merisier teint couleur noisette.
guests bathroom
salle de bain d'invités

Unfinished basement (we have to install our own laminate floor so we can dance and train there! hehe) with its gas fireplace (the tiles are the same than those in the entrance)
Sous-sol non fini (on doit installer notre plancher flottant pour danser et nous entraîner) avec un foyer au gaz (les tuiles sont les memes que dans l'entrée)
entrance (foyer) and the railing (yeah, it's all dirty, they are not done yet)
entrée et rampes (oui, c'est encore sale, ils n'ont pas fini!)

part 2 /partie 2

1st: finishing the siding at the back
2nd: the front finished too
3rd: finished kitchen
4th: the first floor

-----
1: on termine la pose du vynile derrière
2: façade finie
3: cuisine finie
4: le premier étage




MAJOR UPDATE / GROSSE MISE À JOUR (1)

Alors, oui, bon, on se tient ultra-méga-occupés... difficile de mettre le blog à jour...
Voici donc, plus ou moins dans l'ordre les photos prises avec l'appareil-photo de Josée.

Alright, so yeah, we've been super duper busy... sorry for not updating the blog...
So here are various pictures from Josee's camera, more or less in order.


Our basement and the beginnings of our heating/cooling system...
Notre sous-sol coulé et les débuts de ce qui deviendra notre systeme de chauffage et d'aération...
Woohoo! we have a porch!
Wouuhouu! une galerie!
Windows at the back...
Des fenêtres à l'arrière!

Windows at the front...
Des fenêtres sur la façade!



Façade
The front...









dimanche 7 juin 2009

visite des parents / Josee's parents visit


Mes parents sont venus voir les progrès de la maison en mai.
Il mouillait à boire debout, mais on avait un toit... meme s'il coulait hihihi


My parents came to see how the house looked like beginning of May.
It was raining like crazy but we had a roof... though it was leaking a bit ;)






Floors...kinda / Planchers... mettons




nos planchers, sur le point d'être installés, fin avril 2009.


et une autre vue des deux étages.




our floors about to be installed, end of April 2009.


and another view of our two floors.